Sample report

This is what ConstruLog produces in seconds

The report below was generated by AI from jobsite photos, a voice note, and a checklist — the same workflow you would use on site.

Daily Progress Report — Week 12

Daily report #047

Riverside Duplex Renovation Austin, TX
M. Herrera Thursday, July 2, 2026

Report

Work progressed on schedule across both units. The crew completed the second-floor drywall installation in Unit A, including taping and the first coat of joint compound on all interior partitions. Electrical rough-in inspection passed in the morning with no corrections required.

In Unit B, the plumbing team finished the supply line replacement in the main bathroom and pressure-tested the new PEX runs at 100 PSI for 30 minutes with no drop. The window delivery scheduled for today arrived complete; all 14 units were verified against the order sheet and staged in the garage.

One issue was identified: minor water staining on the subfloor near the Unit B kitchen exterior wall, consistent with the flashing gap documented in last week's report. The area was photographed and the framing subcontractor was notified. No structural impact observed; remediation is scheduled before insulation.

Voice notes

Voice note 1 · 0:42

Quick note after the walkthrough — the inspector signed off on the electrical rough-in, no corrections. Windows all came in today, fourteen units, checked them one by one. Flag the subfloor staining by the kitchen wall in unit B for Carlos, we need the flashing fixed before insulation goes in next week.

Checklists

Week 12 — Interior milestones

Progress: 5/7

Completed

  • Unit A drywall installation (2nd floor)
  • Electrical rough-in inspection
  • Unit B bathroom supply line replacement
  • PEX pressure test (100 PSI / 30 min)
  • Window delivery verification (14 units)

Pending

  • Flashing remediation — Unit B kitchen wall
  • Insulation pre-check walkthrough

Photo documentation

Second-floor interior showing completed drywall installation on partition walls. Joints are taped with the first compound coat applied. Work area is clean; temporary lighting and OSHA-compliant railing visible at the stair opening.

Jul 2, 2026 · 9:41 AM · GPS tagged

Second-floor interior showing completed drywall installation on partition walls. Joints are taped with the first compound coat applied. Work area is clean; temporary lighting and OSHA-compliant railing visible at the stair opening.

Staged window units in garage area, verified against delivery manifest. Frames show no visible transit damage. Protective film intact on all glazing surfaces.

Jul 2, 2026 · 2:17 PM · GPS tagged

Staged window units in garage area, verified against delivery manifest. Frames show no visible transit damage. Protective film intact on all glazing surfaces.

Sample data from a fictional project. Names and details are illustrative.

Your project. The same report. Seconds.