아래 보고서는 현장 사진, 음성 메모, 체크리스트로 AI가 생성했습니다. 현장에서 사용하는 것과 동일한 워크플로입니다.
Daily report #047
Work progressed on schedule across both units. The crew completed the second-floor drywall installation in Unit A, including taping and the first coat of joint compound on all interior partitions. Electrical rough-in inspection passed in the morning with no corrections required.
In Unit B, the plumbing team finished the supply line replacement in the main bathroom and pressure-tested the new PEX runs at 100 PSI for 30 minutes with no drop. The window delivery scheduled for today arrived complete; all 14 units were verified against the order sheet and staged in the garage.
One issue was identified: minor water staining on the subfloor near the Unit B kitchen exterior wall, consistent with the flashing gap documented in last week's report. The area was photographed and the framing subcontractor was notified. No structural impact observed; remediation is scheduled before insulation.
Voice note 1 · 0:42
“Quick note after the walkthrough — the inspector signed off on the electrical rough-in, no corrections. Windows all came in today, fourteen units, checked them one by one. Flag the subfloor staining by the kitchen wall in unit B for Carlos, we need the flashing fixed before insulation goes in next week.”
Week 12 — Interior milestones
Progress: 5/7
Completed
Pending

Jul 2, 2026 · 9:41 AM · GPS tagged
Second-floor interior showing completed drywall installation on partition walls. Joints are taped with the first compound coat applied. Work area is clean; temporary lighting and OSHA-compliant railing visible at the stair opening.

Jul 2, 2026 · 2:17 PM · GPS tagged
Staged window units in garage area, verified against delivery manifest. Frames show no visible transit damage. Protective film intact on all glazing surfaces.
가상 프로젝트의 샘플 데이터입니다. 이름과 세부 정보는 예시입니다.